Files
portfolio/.bmad/bmm/workflows/3-solutioning/implementation-readiness/template.md
T
mahdiarghyani 1586bb7f80 chore: add BMAD agent workflows and configuration system
- Add comprehensive agent workflow definitions for 8 specialized roles (analyst, architect, developer, product manager, scrum master, technical writer, UX designer, QA engineer)
- Add 35+ workflow definitions covering analysis, planning, solutioning, and implementation phases
- Add BMAD configuration system with agent, task, tool, workflow, and file manifests
- Add BMM (Business Model Methodology) documentation including quick-start guides, architecture references, and workflow analysis
- Add test architecture knowledge base with 20+ testing patterns and best practices
- Add team configuration templates and party mode setup for collaborative development
- Establish foundation for enterprise agentic development framework with adaptive scaling capabilities
2025-11-30 14:36:05 +03:30

1.9 KiB

Implementation Readiness Assessment Report

Date: {{date}} Project: {{project_name}} Assessed By: {{user_name}} Assessment Type: Phase 3 to Phase 4 Transition Validation


Executive Summary

{{readiness_assessment}}


Project Context

{{project_context}}


Document Inventory

Documents Reviewed

{{document_inventory}}

Document Analysis Summary

{{document_analysis}}


Alignment Validation Results

Cross-Reference Analysis

{{alignment_validation}}


Gap and Risk Analysis

Critical Findings

{{gap_risk_analysis}}


UX and Special Concerns

{{ux_validation}}


Detailed Findings

🔴 Critical Issues

Must be resolved before proceeding to implementation

{{critical_issues}}

🟠 High Priority Concerns

Should be addressed to reduce implementation risk

{{high_priority_concerns}}

🟡 Medium Priority Observations

Consider addressing for smoother implementation

{{medium_priority_observations}}

🟢 Low Priority Notes

Minor items for consideration

{{low_priority_notes}}


Positive Findings

✅ Well-Executed Areas

{{positive_findings}}


Recommendations

Immediate Actions Required

{{immediate_actions}}

Suggested Improvements

{{suggested_improvements}}

Sequencing Adjustments

{{sequencing_adjustments}}


Readiness Decision

Overall Assessment: {{overall_readiness_status}}

{{readiness_rationale}}

Conditions for Proceeding (if applicable)

{{conditions_for_proceeding}}


Next Steps

{{recommended_next_steps}}

Workflow Status Update

{{status_update_result}}


Appendices

A. Validation Criteria Applied

{{validation_criteria_used}}

B. Traceability Matrix

{{traceability_matrix}}

C. Risk Mitigation Strategies

{{risk_mitigation_strategies}}


This readiness assessment was generated using the BMad Method Implementation Readiness workflow (v6-alpha)